description abstractThe identification and analysis of compensable delays become necessary on most construction projects. Although there are several different analytical techniques available, the window method of contemporaneously analyzing delays is the most realistic. The reasons for the superiority of the window method are discussed. The possible results of a window analysis are evaluated and graphically presented. Also discussed are a correction, or intermediate step, in the method, necessary to avoid incorrect findings of false concurrency, and the proper method for handling apportionable and nonapportionable delays. Finally, an argument is made that the burden of proving noncompensable delays, assuming a proper window analysis of compensable delays by a contractor, should be borne by the owner.
publisherAmerican Society of Civil Engineers
titleWindow Analyses of Compensable Delays
typeJournal Paper
journal volume125
journal issue2
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1999)125:2(96)
treeJournal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record