contributor author | Linghua Xiong | |
contributor author | Wang Fan | |
date accessioned | 2017-05-08T22:22:21Z | |
date available | 2017-05-08T22:22:21Z | |
date copyright | April 2015 | |
date issued | 2015 | |
identifier other | 43575483.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/78956 | |
description abstract | The purpose of this study is to calculate the maintenance interval time (MIT) of steel structure of a large gantry crane in shipyard and provide basis for a maintenance plan. By analyzing a mechanical model of the lifting process, stress spectrum and fatigue damage are calculated. Based on the fatigue reliability theory, rational MIT and maintenance strategy are suggested. Compared with the existing empirical regulation, the solution of this study is safer, cheaper, and more efficient. | |
publisher | American Society of Civil Engineers | |
title | Maintenance Strategy for Steel Structures of Large Gantry Crane Based on Fatigue Reliability | |
type | Journal Paper | |
journal volume | 29 | |
journal issue | 2 | |
journal title | Journal of Performance of Constructed Facilities | |
identifier doi | 10.1061/(ASCE)CF.1943-5509.0000497 | |
tree | Journal of Performance of Constructed Facilities:;2015:;Volume ( 029 ):;issue: 002 | |
contenttype | Fulltext | |