Show simple item record

contributor authorLinghua Xiong
contributor authorWang Fan
date accessioned2017-05-08T22:22:21Z
date available2017-05-08T22:22:21Z
date copyrightApril 2015
date issued2015
identifier other43575483.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/78956
description abstractThe purpose of this study is to calculate the maintenance interval time (MIT) of steel structure of a large gantry crane in shipyard and provide basis for a maintenance plan. By analyzing a mechanical model of the lifting process, stress spectrum and fatigue damage are calculated. Based on the fatigue reliability theory, rational MIT and maintenance strategy are suggested. Compared with the existing empirical regulation, the solution of this study is safer, cheaper, and more efficient.
publisherAmerican Society of Civil Engineers
titleMaintenance Strategy for Steel Structures of Large Gantry Crane Based on Fatigue Reliability
typeJournal Paper
journal volume29
journal issue2
journal titleJournal of Performance of Constructed Facilities
identifier doi10.1061/(ASCE)CF.1943-5509.0000497
treeJournal of Performance of Constructed Facilities:;2015:;Volume ( 029 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record