YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Risk-Informed Time-Cost Relationship Models for Sanitation Projects

    Source: Journal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 005
    Author:
    Vitor Sousa
    ,
    Nuno Marques Almeida
    ,
    Luís Alves Dias
    ,
    Fernando António Branco
    DOI: 10.1061/(ASCE)CO.1943-7862.0000848
    Publisher: American Society of Civil Engineers
    Abstract: The purpose of this study is to (1) verify whether the time performance of water and sewer projects is statistically different; and (2) develop time-cost relationship (TCR) models for sanitation projects in Chicago, Illinois. The analysis is performed on data from 180 projects completed in Chicago between 1994 and 2002. Because the time performance of a construction project is not entirely explained by the cost, a practical application is also suggested for using the TCR models confidence level intervals to quantify the qualitative risk level associated with the project time performance.
    • Download: (1.086Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Risk-Informed Time-Cost Relationship Models for Sanitation Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/78800
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorVitor Sousa
    contributor authorNuno Marques Almeida
    contributor authorLuís Alves Dias
    contributor authorFernando António Branco
    date accessioned2017-05-08T22:21:58Z
    date available2017-05-08T22:21:58Z
    date copyrightMay 2014
    date issued2014
    identifier other43412158.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/78800
    description abstractThe purpose of this study is to (1) verify whether the time performance of water and sewer projects is statistically different; and (2) develop time-cost relationship (TCR) models for sanitation projects in Chicago, Illinois. The analysis is performed on data from 180 projects completed in Chicago between 1994 and 2002. Because the time performance of a construction project is not entirely explained by the cost, a practical application is also suggested for using the TCR models confidence level intervals to quantify the qualitative risk level associated with the project time performance.
    publisherAmerican Society of Civil Engineers
    titleRisk-Informed Time-Cost Relationship Models for Sanitation Projects
    typeJournal Paper
    journal volume140
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000848
    treeJournal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian