description abstractThe purpose of this study is to (1) verify whether the time performance of water and sewer projects is statistically different; and (2) develop time-cost relationship (TCR) models for sanitation projects in Chicago, Illinois. The analysis is performed on data from 180 projects completed in Chicago between 1994 and 2002. Because the time performance of a construction project is not entirely explained by the cost, a practical application is also suggested for using the TCR models confidence level intervals to quantify the qualitative risk level associated with the project time performance.
publisherAmerican Society of Civil Engineers
titleRisk-Informed Time-Cost Relationship Models for Sanitation Projects
typeJournal Paper
journal volume140
journal issue5
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0000848
treeJournal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record