YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Integral Lifting of a Three-Span Continuous Beam Bridge

    Source: Journal of Performance of Constructed Facilities:;2015:;Volume ( 029 ):;issue: 004
    Author:
    Changjie Xu
    ,
    Lige Xu
    ,
    Jian Zhou
    DOI: 10.1061/(ASCE)CF.1943-5509.0000598
    Publisher: American Society of Civil Engineers
    Abstract: A three-span-continuous girder bridge has to be integrally lifted by 3 m to meet increased navigation capacity. This paper mainly introduces the lifting system mechanism, construction process, and bridge jack-up monitoring. To determine the control threshold value during the construction process and to ensure the safety of successive lifting, a three-dimensional finite-element model is established to analyze the strain and stress distribution characteristics of the bridge. With guidance from the numerical analyses, the three-continuous-span girder bridge is lifted successfully. The design and construction methods adopted in this project provide a useful reference for similar engineering projects.
    • Download: (9.263Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Integral Lifting of a Three-Span Continuous Beam Bridge

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/71807
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorChangjie Xu
    contributor authorLige Xu
    contributor authorJian Zhou
    date accessioned2017-05-08T22:07:28Z
    date available2017-05-08T22:07:28Z
    date copyrightAugust 2015
    date issued2015
    identifier other29926383.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/71807
    description abstractA three-span-continuous girder bridge has to be integrally lifted by 3 m to meet increased navigation capacity. This paper mainly introduces the lifting system mechanism, construction process, and bridge jack-up monitoring. To determine the control threshold value during the construction process and to ensure the safety of successive lifting, a three-dimensional finite-element model is established to analyze the strain and stress distribution characteristics of the bridge. With guidance from the numerical analyses, the three-continuous-span girder bridge is lifted successfully. The design and construction methods adopted in this project provide a useful reference for similar engineering projects.
    publisherAmerican Society of Civil Engineers
    titleIntegral Lifting of a Three-Span Continuous Beam Bridge
    typeJournal Paper
    journal volume29
    journal issue4
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)CF.1943-5509.0000598
    treeJournal of Performance of Constructed Facilities:;2015:;Volume ( 029 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian