| contributor author | Luis Filipe Caetano | |
| contributor author | Paulo Fonseca Teixeira | |
| date accessioned | 2017-05-08T22:02:32Z | |
| date available | 2017-05-08T22:02:32Z | |
| date copyright | September 2013 | |
| date issued | 2013 | |
| identifier other | %28asce%29te%2E1943-5436%2E0000621.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/69603 | |
| description abstract | This paper proposes a multiobjective optimization approach for planning railway ballast, rail, and sleeper renewal operations. The objective is to support an informed decision that considers not only the railway track life-cycle cost (LCC) but also the track occupation times required to perform interventions. Two objective functions were minimized, as follows: (1) railway track unavailability caused by railway track maintenance and renewal operations, and (2) railway track components’ LCC. Furthermore, to rationalize the renewal strategy, the model considers a multicomponent formulation that assesses, in time and space, the opportunistic combination of railway track renewal activities. A numerical application of the model on a real case study (Lisbon-Oporto line) is developed and discussed. The results show the interest of using this simple multiobjective optimization approach to obtain a decision-making process to support the scheduling of major railway track renewal works with an informed LCC-unavailability trade-off. | |
| publisher | American Society of Civil Engineers | |
| title | Availability Approach to Optimizing Railway Track Renewal Operations | |
| type | Journal Paper | |
| journal volume | 139 | |
| journal issue | 9 | |
| journal title | Journal of Transportation Engineering, Part A: Systems | |
| identifier doi | 10.1061/(ASCE)TE.1943-5436.0000575 | |
| tree | Journal of Transportation Engineering, Part A: Systems:;2013:;Volume ( 139 ):;issue: 009 | |
| contenttype | Fulltext | |