contributor authorLuis Filipe Caetano
contributor authorPaulo Fonseca Teixeira
date accessioned2017-05-08T22:02:32Z
date available2017-05-08T22:02:32Z
date copyrightSeptember 2013
date issued2013
identifier other%28asce%29te%2E1943-5436%2E0000621.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/69603
description abstractThis paper proposes a multiobjective optimization approach for planning railway ballast, rail, and sleeper renewal operations. The objective is to support an informed decision that considers not only the railway track life-cycle cost (LCC) but also the track occupation times required to perform interventions. Two objective functions were minimized, as follows: (1) railway track unavailability caused by railway track maintenance and renewal operations, and (2) railway track components’ LCC. Furthermore, to rationalize the renewal strategy, the model considers a multicomponent formulation that assesses, in time and space, the opportunistic combination of railway track renewal activities. A numerical application of the model on a real case study (Lisbon-Oporto line) is developed and discussed. The results show the interest of using this simple multiobjective optimization approach to obtain a decision-making process to support the scheduling of major railway track renewal works with an informed LCC-unavailability trade-off.
publisherAmerican Society of Civil Engineers
titleAvailability Approach to Optimizing Railway Track Renewal Operations
typeJournal Paper
journal volume139
journal issue9
journal titleJournal of Transportation Engineering, Part A: Systems
identifier doi10.1061/(ASCE)TE.1943-5436.0000575
treeJournal of Transportation Engineering, Part A: Systems:;2013:;Volume ( 139 ):;issue: 009
contenttypeFulltext