| contributor author | Teng Huang | |
| contributor author | Guihua Li | |
| contributor author | Hongyu Chen | |
| contributor author | Minwei Jiang | |
| date accessioned | 2017-05-08T22:01:13Z | |
| date available | 2017-05-08T22:01:13Z | |
| date copyright | February 2010 | |
| date issued | 2010 | |
| identifier other | %28asce%29su%2E1943-5428%2E0000059.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/68891 | |
| description abstract | The third Nanjing Yangtze River Bridge is a steel pylon cable stayed bridge. Such a structure is new in China and therefore brings new challenges to the work of control surveys. This paper describes the survey methods used for building and erecting the steel pylons and for construction of the steel tower. The survey methods adopted have proven successful and can be used as reference for similar projects in the future. | |
| publisher | American Society of Civil Engineers | |
| title | Precise Control Survey for Erecting the Steel Pylons of the Third Nanjing Yangtze River Bridge, China: Case Study | |
| type | Journal Paper | |
| journal volume | 136 | |
| journal issue | 1 | |
| journal title | Journal of Surveying Engineering | |
| identifier doi | 10.1061/(ASCE)SU.1943-5428.0000012 | |
| tree | Journal of Surveying Engineering:;2010:;Volume ( 136 ):;issue: 001 | |
| contenttype | Fulltext | |