YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Surveying Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Surveying Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Precise Control Survey for Erecting the Steel Pylons of the Third Nanjing Yangtze River Bridge, China: Case Study

    Source: Journal of Surveying Engineering:;2010:;Volume ( 136 ):;issue: 001
    Author:
    Teng Huang
    ,
    Guihua Li
    ,
    Hongyu Chen
    ,
    Minwei Jiang
    DOI: 10.1061/(ASCE)SU.1943-5428.0000012
    Publisher: American Society of Civil Engineers
    Abstract: The third Nanjing Yangtze River Bridge is a steel pylon cable stayed bridge. Such a structure is new in China and therefore brings new challenges to the work of control surveys. This paper describes the survey methods used for building and erecting the steel pylons and for construction of the steel tower. The survey methods adopted have proven successful and can be used as reference for similar projects in the future.
    • Download: (417.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Precise Control Survey for Erecting the Steel Pylons of the Third Nanjing Yangtze River Bridge, China: Case Study

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/68891
    Collections
    • Journal of Surveying Engineering

    Show full item record

    contributor authorTeng Huang
    contributor authorGuihua Li
    contributor authorHongyu Chen
    contributor authorMinwei Jiang
    date accessioned2017-05-08T22:01:13Z
    date available2017-05-08T22:01:13Z
    date copyrightFebruary 2010
    date issued2010
    identifier other%28asce%29su%2E1943-5428%2E0000059.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/68891
    description abstractThe third Nanjing Yangtze River Bridge is a steel pylon cable stayed bridge. Such a structure is new in China and therefore brings new challenges to the work of control surveys. This paper describes the survey methods used for building and erecting the steel pylons and for construction of the steel tower. The survey methods adopted have proven successful and can be used as reference for similar projects in the future.
    publisherAmerican Society of Civil Engineers
    titlePrecise Control Survey for Erecting the Steel Pylons of the Third Nanjing Yangtze River Bridge, China: Case Study
    typeJournal Paper
    journal volume136
    journal issue1
    journal titleJournal of Surveying Engineering
    identifier doi10.1061/(ASCE)SU.1943-5428.0000012
    treeJournal of Surveying Engineering:;2010:;Volume ( 136 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian