contributor authorTeng Huang
contributor authorGuihua Li
contributor authorHongyu Chen
contributor authorMinwei Jiang
date accessioned2017-05-08T22:01:13Z
date available2017-05-08T22:01:13Z
date copyrightFebruary 2010
date issued2010
identifier other%28asce%29su%2E1943-5428%2E0000059.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/68891
description abstractThe third Nanjing Yangtze River Bridge is a steel pylon cable stayed bridge. Such a structure is new in China and therefore brings new challenges to the work of control surveys. This paper describes the survey methods used for building and erecting the steel pylons and for construction of the steel tower. The survey methods adopted have proven successful and can be used as reference for similar projects in the future.
publisherAmerican Society of Civil Engineers
titlePrecise Control Survey for Erecting the Steel Pylons of the Third Nanjing Yangtze River Bridge, China: Case Study
typeJournal Paper
journal volume136
journal issue1
journal titleJournal of Surveying Engineering
identifier doi10.1061/(ASCE)SU.1943-5428.0000012
treeJournal of Surveying Engineering:;2010:;Volume ( 136 ):;issue: 001
contenttypeFulltext