YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Quality Management Evaluation Based on Self-Control and Cosupervision Mechanism in PIP

    Source: Journal of Management in Engineering:;2014:;Volume ( 030 ):;issue: 002
    Author:
    Yunna Wu
    ,
    Yong Huang
    ,
    Shuo Zhang
    ,
    Yan Zhang
    DOI: 10.1061/(ASCE)ME.1943-5479.0000193
    Publisher: American Society of Civil Engineers
    Abstract: Public investment project (PIP) plays an important role in national economy in China. In order to improve the project management performance of PIP, the government is searching for a method to build a construction management supervision system. This paper introduces the background and the connotation of agent construction system (ACS), and analyzes the supervision mechanism of construction agent quality management under the two-stage agent mode, puts forward a quality self-control, and government cosupervision mechanism. It consists of a two-dimensional framework of vertical agent self-control and horizontal government cosupervision. For the purpose of better supervision, based on the mechanism, the article introduces rough set theory and questionnaire survey into the research; a quality evaluation model is established. The model builds an information decision table; a heuristic attribute reduction algorithm is applied to reduce the index and helps to get the supervision points. The regulatory authorities can use the evaluation results, and make quality control plan to ensure the effective PIP supervision.
    • Download: (1.067Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Quality Management Evaluation Based on Self-Control and Cosupervision Mechanism in PIP

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/66251
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorYunna Wu
    contributor authorYong Huang
    contributor authorShuo Zhang
    contributor authorYan Zhang
    date accessioned2017-05-08T21:54:46Z
    date available2017-05-08T21:54:46Z
    date copyrightMarch 2014
    date issued2014
    identifier other%28asce%29me%2E1943-5479%2E0000230.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/66251
    description abstractPublic investment project (PIP) plays an important role in national economy in China. In order to improve the project management performance of PIP, the government is searching for a method to build a construction management supervision system. This paper introduces the background and the connotation of agent construction system (ACS), and analyzes the supervision mechanism of construction agent quality management under the two-stage agent mode, puts forward a quality self-control, and government cosupervision mechanism. It consists of a two-dimensional framework of vertical agent self-control and horizontal government cosupervision. For the purpose of better supervision, based on the mechanism, the article introduces rough set theory and questionnaire survey into the research; a quality evaluation model is established. The model builds an information decision table; a heuristic attribute reduction algorithm is applied to reduce the index and helps to get the supervision points. The regulatory authorities can use the evaluation results, and make quality control plan to ensure the effective PIP supervision.
    publisherAmerican Society of Civil Engineers
    titleQuality Management Evaluation Based on Self-Control and Cosupervision Mechanism in PIP
    typeJournal Paper
    journal volume30
    journal issue2
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000193
    treeJournal of Management in Engineering:;2014:;Volume ( 030 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian