YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Performance Risk Associated with Renewable Energy CDM Projects

    Source: Journal of Management in Engineering:;2012:;Volume ( 028 ):;issue: 001
    Author:
    Maria C. A. Balatbat
    ,
    Emily Findlay
    ,
    David G. Carmichael
    DOI: 10.1061/(ASCE)ME.1943-5479.0000090
    Publisher: American Society of Civil Engineers
    Abstract: The clean development mechanism (CDM), part of the Kyoto Protocol to combat rising carbon emissions, allows projects to proceed in developing countries in return for providing carbon credits to developed countries. The feasibility of CDM projects is commonly justified through a combination of sale of the end product and carbon credits, which have a financial value, generated through carbon emissions avoided. However, the carbon credits assumed or estimated at the feasibility stage may not be realized or achieved on project completion; the issuance of carbon credits may be less than that originally estimated, thereby affecting project feasibility. This paper examines the performance risk associated with the discrepancy between estimated and issued carbon credits. Data for 227 renewable energy projects, comprising hydroelectric and wind power of varying scale and in multiple countries, are examined in establishing the performance risk. The study found that overall, the hydroelectric power projects performed similarly on average to the wind-power projects for both large- and small-sized projects. Generally, estimated certified emission reductions (CERs) were not achieved. However, certain categories (type, scale, host country, monitoring period) performed better than others. The results will be of interest to investors, regulators, and researchers in such energy-carbon projects.
    • Download: (325.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Performance Risk Associated with Renewable Energy CDM Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/66147
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorMaria C. A. Balatbat
    contributor authorEmily Findlay
    contributor authorDavid G. Carmichael
    date accessioned2017-05-08T21:54:34Z
    date available2017-05-08T21:54:34Z
    date copyrightJanuary 2012
    date issued2012
    identifier other%28asce%29me%2E1943-5479%2E0000119.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/66147
    description abstractThe clean development mechanism (CDM), part of the Kyoto Protocol to combat rising carbon emissions, allows projects to proceed in developing countries in return for providing carbon credits to developed countries. The feasibility of CDM projects is commonly justified through a combination of sale of the end product and carbon credits, which have a financial value, generated through carbon emissions avoided. However, the carbon credits assumed or estimated at the feasibility stage may not be realized or achieved on project completion; the issuance of carbon credits may be less than that originally estimated, thereby affecting project feasibility. This paper examines the performance risk associated with the discrepancy between estimated and issued carbon credits. Data for 227 renewable energy projects, comprising hydroelectric and wind power of varying scale and in multiple countries, are examined in establishing the performance risk. The study found that overall, the hydroelectric power projects performed similarly on average to the wind-power projects for both large- and small-sized projects. Generally, estimated certified emission reductions (CERs) were not achieved. However, certain categories (type, scale, host country, monitoring period) performed better than others. The results will be of interest to investors, regulators, and researchers in such energy-carbon projects.
    publisherAmerican Society of Civil Engineers
    titlePerformance Risk Associated with Renewable Energy CDM Projects
    typeJournal Paper
    journal volume28
    journal issue1
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000090
    treeJournal of Management in Engineering:;2012:;Volume ( 028 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian