Case for Expanding the Claim Dispute Resolution Training of TxDOT PersonnelSource: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2010:;Volume ( 002 ):;issue: 004Author:Yetkin Yildirim
DOI: 10.1061/(ASCE)LA.1943-4170.0000029Publisher: American Society of Civil Engineers
Abstract: Texas Department of Transportation (TxDOT) currently uses general alternative dispute resolution and dispute management tactics to resolve construction claims. The successful application by TxDOT of project partnering methods, critical path management, and the Contract Claims Committee has resulted in a relatively low number of claims filed. However, one weakness in TxDOT’s current methodology is the lack of specific protocol for project-level personnel and administrators. The following survey of TxDOT dispute resolution methods emphasizes the importance of developing a personnel training catalog for Area Engineers in order to avoid costly claim dispute escalation. As the individual primarily responsible for resolving project and district-level disputes, the Area Engineer should be equipped with dispute resolution training if TxDOT wishes to improve the efficiency of its alternative dispute resolution protocol.
|
Show full item record
| contributor author | Yetkin Yildirim | |
| date accessioned | 2017-05-08T21:53:59Z | |
| date available | 2017-05-08T21:53:59Z | |
| date copyright | November 2010 | |
| date issued | 2010 | |
| identifier other | %28asce%29la%2E1943-4170%2E0000062.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/65795 | |
| description abstract | Texas Department of Transportation (TxDOT) currently uses general alternative dispute resolution and dispute management tactics to resolve construction claims. The successful application by TxDOT of project partnering methods, critical path management, and the Contract Claims Committee has resulted in a relatively low number of claims filed. However, one weakness in TxDOT’s current methodology is the lack of specific protocol for project-level personnel and administrators. The following survey of TxDOT dispute resolution methods emphasizes the importance of developing a personnel training catalog for Area Engineers in order to avoid costly claim dispute escalation. As the individual primarily responsible for resolving project and district-level disputes, the Area Engineer should be equipped with dispute resolution training if TxDOT wishes to improve the efficiency of its alternative dispute resolution protocol. | |
| publisher | American Society of Civil Engineers | |
| title | Case for Expanding the Claim Dispute Resolution Training of TxDOT Personnel | |
| type | Journal Paper | |
| journal volume | 2 | |
| journal issue | 4 | |
| journal title | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction | |
| identifier doi | 10.1061/(ASCE)LA.1943-4170.0000029 | |
| tree | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2010:;Volume ( 002 ):;issue: 004 | |
| contenttype | Fulltext |