YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Applying Multiobjective Bilevel Optimization under Fuzzy Random Environment to Traffic Assignment Problem: Case Study of a Large-Scale Construction Project

    Source: Journal of Infrastructure Systems:;2014:;Volume ( 020 ):;issue: 003
    Author:
    Jiuping Xu
    ,
    Yan Tu
    ,
    Xiao Lei
    DOI: 10.1061/(ASCE)IS.1943-555X.0000147
    Publisher: American Society of Civil Engineers
    Abstract: This article presents an optimization method for solving a material flow traffic assignment problem (TAP) in a large-scale construction project considering a hierarchical structure with fuzzy random variables. A multiobjective bilevel decision-making model is established in which the transportation time and cost in each arc are considered as fuzzy random variables. The construction contractor, the leader in the hierarchy, aims to minimize both total direct and transportation time costs. The transportation agency, next in the hierarchy, assesses the target to minimize total transportation cost. To deal with the uncertainties, the expected value operator and chance constraint method are used to transform the uncertain model into a calculable one. Furthermore, a multiobjective bilevel particle swarm optimization algorithm with a fuzzy random simulation-based constraint checking procedure is applied to solve the model. Finally, the Shuibuya Hydropower Project is used as a practical example to demonstrate the practicality and efficiency of the proposed model. Results and a sensitivity analysis are presented to highlight the performance of the optimization method.
    • Download: (449.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Applying Multiobjective Bilevel Optimization under Fuzzy Random Environment to Traffic Assignment Problem: Case Study of a Large-Scale Construction Project

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/65740
    Collections
    • Journal of Infrastructure Systems

    Show full item record

    contributor authorJiuping Xu
    contributor authorYan Tu
    contributor authorXiao Lei
    date accessioned2017-05-08T21:53:54Z
    date available2017-05-08T21:53:54Z
    date copyrightSeptember 2014
    date issued2014
    identifier other%28asce%29is%2E1943-555x%2E0000180.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/65740
    description abstractThis article presents an optimization method for solving a material flow traffic assignment problem (TAP) in a large-scale construction project considering a hierarchical structure with fuzzy random variables. A multiobjective bilevel decision-making model is established in which the transportation time and cost in each arc are considered as fuzzy random variables. The construction contractor, the leader in the hierarchy, aims to minimize both total direct and transportation time costs. The transportation agency, next in the hierarchy, assesses the target to minimize total transportation cost. To deal with the uncertainties, the expected value operator and chance constraint method are used to transform the uncertain model into a calculable one. Furthermore, a multiobjective bilevel particle swarm optimization algorithm with a fuzzy random simulation-based constraint checking procedure is applied to solve the model. Finally, the Shuibuya Hydropower Project is used as a practical example to demonstrate the practicality and efficiency of the proposed model. Results and a sensitivity analysis are presented to highlight the performance of the optimization method.
    publisherAmerican Society of Civil Engineers
    titleApplying Multiobjective Bilevel Optimization under Fuzzy Random Environment to Traffic Assignment Problem: Case Study of a Large-Scale Construction Project
    typeJournal Paper
    journal volume20
    journal issue3
    journal titleJournal of Infrastructure Systems
    identifier doi10.1061/(ASCE)IS.1943-555X.0000147
    treeJournal of Infrastructure Systems:;2014:;Volume ( 020 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian