YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Geotechnical and Geoenvironmental Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Geotechnical and Geoenvironmental Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Long-Term Monitoring of Strain in Instrumented Piles

    Source: Journal of Geotechnical and Geoenvironmental Engineering:;2009:;Volume ( 135 ):;issue: 011
    Author:
    Bengt H. Fellenius
    ,
    Sung-Ryul Kim
    ,
    Sung-Gyo Chung
    DOI: 10.1061/(ASCE)GT.1943-5606.0000124
    Publisher: American Society of Civil Engineers
    Abstract: The development of strain in two 31 and 56 m long instrumented postdriving grouted cylinder piles at a site west of Busan, South Korea, were monitored during 200 days after construction, whereupon a static loading test was performed. Initial strain measurements showed unexpected elongation of the pile, probably due to swelling from absorption of water but as the soil reconsolidated, the elongation changed into shortening, probably due to imposed residual load in the pile. The resulting compression of the pile eventually offset the swelling of the pile. To investigate the cause of the strain changes more closely and enhance the evaluation of the field data, two short pile pieces were prepared and placed free-standing above ground in an outside laboratory. One piece was from a cylinder pile of which central void was grouted and one was made up by grouting inside a temporary casing. The monitoring showed that the short pieces appeared first to shorten and then to elongate due to the heating and cooling from the hydration process. When strains and temperature had stabilized 150 days after start of the study, both pieces were submerged to introduce swelling of the concrete. For the first 100 days after submerging, the swelling strains in both short pieces amounted to
    • Download: (1.633Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Long-Term Monitoring of Strain in Instrumented Piles

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/61892
    Collections
    • Journal of Geotechnical and Geoenvironmental Engineering

    Show full item record

    contributor authorBengt H. Fellenius
    contributor authorSung-Ryul Kim
    contributor authorSung-Gyo Chung
    date accessioned2017-05-08T21:46:27Z
    date available2017-05-08T21:46:27Z
    date copyrightNovember 2009
    date issued2009
    identifier other%28asce%29gt%2E1943-5606%2E0000140.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/61892
    description abstractThe development of strain in two 31 and 56 m long instrumented postdriving grouted cylinder piles at a site west of Busan, South Korea, were monitored during 200 days after construction, whereupon a static loading test was performed. Initial strain measurements showed unexpected elongation of the pile, probably due to swelling from absorption of water but as the soil reconsolidated, the elongation changed into shortening, probably due to imposed residual load in the pile. The resulting compression of the pile eventually offset the swelling of the pile. To investigate the cause of the strain changes more closely and enhance the evaluation of the field data, two short pile pieces were prepared and placed free-standing above ground in an outside laboratory. One piece was from a cylinder pile of which central void was grouted and one was made up by grouting inside a temporary casing. The monitoring showed that the short pieces appeared first to shorten and then to elongate due to the heating and cooling from the hydration process. When strains and temperature had stabilized 150 days after start of the study, both pieces were submerged to introduce swelling of the concrete. For the first 100 days after submerging, the swelling strains in both short pieces amounted to
    publisherAmerican Society of Civil Engineers
    titleLong-Term Monitoring of Strain in Instrumented Piles
    typeJournal Paper
    journal volume135
    journal issue11
    journal titleJournal of Geotechnical and Geoenvironmental Engineering
    identifier doi10.1061/(ASCE)GT.1943-5606.0000124
    treeJournal of Geotechnical and Geoenvironmental Engineering:;2009:;Volume ( 135 ):;issue: 011
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian