YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Contractor Selection Model for Highway Projects Using Integrated Simulation and Analytic Network Process

    Source: Journal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 007
    Author:
    Mohammed S. El-Abbasy
    ,
    Tarek Zayed
    ,
    Marwa Ahmed
    ,
    Hani Alzraiee
    ,
    Mona Abouhamad
    DOI: 10.1061/(ASCE)CO.1943-7862.0000647
    Publisher: American Society of Civil Engineers
    Abstract: Selecting the appropriate contractor is a significant step to highway project success. The process of selection is subjected to uncertainty and influence of criteria other than bid price. This paper presents an approach to prioritize competitive contractors at the prebidding stage for highway projects by utilizing the analytic network process (ANP) and Monte Carlo simulation. Both techniques are integrated on a single platform to build the proposed model. Initially, the main quantitative and qualitative criteria affecting the contractors’ selection process are identified and studied. The effective criteria in the selection process were obtained from experts and literature. A structured questionnaire was designed and sent to experts in highway projects. The ANP was used to prioritize these criteria subsequently, and Monte Carlo simulation was utilized to develop the selection model. The applicability of the proposed model was tested using four real cases of highway projects. It was concluded that using the lowest bid price as a sole criterion for selecting the best contractors may not result in an optimum solution.
    • Download: (1.407Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Contractor Selection Model for Highway Projects Using Integrated Simulation and Analytic Network Process

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58816
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMohammed S. El-Abbasy
    contributor authorTarek Zayed
    contributor authorMarwa Ahmed
    contributor authorHani Alzraiee
    contributor authorMona Abouhamad
    date accessioned2017-05-08T21:39:56Z
    date available2017-05-08T21:39:56Z
    date copyrightJuly 2013
    date issued2013
    identifier other%28asce%29co%2E1943-7862%2E0000655.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58816
    description abstractSelecting the appropriate contractor is a significant step to highway project success. The process of selection is subjected to uncertainty and influence of criteria other than bid price. This paper presents an approach to prioritize competitive contractors at the prebidding stage for highway projects by utilizing the analytic network process (ANP) and Monte Carlo simulation. Both techniques are integrated on a single platform to build the proposed model. Initially, the main quantitative and qualitative criteria affecting the contractors’ selection process are identified and studied. The effective criteria in the selection process were obtained from experts and literature. A structured questionnaire was designed and sent to experts in highway projects. The ANP was used to prioritize these criteria subsequently, and Monte Carlo simulation was utilized to develop the selection model. The applicability of the proposed model was tested using four real cases of highway projects. It was concluded that using the lowest bid price as a sole criterion for selecting the best contractors may not result in an optimum solution.
    publisherAmerican Society of Civil Engineers
    titleContractor Selection Model for Highway Projects Using Integrated Simulation and Analytic Network Process
    typeJournal Paper
    journal volume139
    journal issue7
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000647
    treeJournal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 007
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian