YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Modified Time Impact Analysis Method

    Source: Journal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 002
    Author:
    Su-Ling Fan
    DOI: 10.1061/(ASCE)CO.1943-7862.0000402
    Publisher: American Society of Civil Engineers
    Abstract: Delay claims are a common occurrence in construction projects. Many techniques have been developed to assess these delays. The time impact technique is the preferred approach for resolving complex disputes that are related to delays and delay compensation. However, this approach is time-consuming and costly to operate. This research proposes a new approach, similar to the time impact technique, which evaluates delay events in chronological order. The details of the modified time impact analysis (MTIA) method are provided, along with one example to demonstrate its advantages. This method is significantly easier to prepare, and the results generated by this new approach are easier to discuss and examine.
    • Download: (618.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Modified Time Impact Analysis Method

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58562
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorSu-Ling Fan
    date accessioned2017-05-08T21:39:31Z
    date available2017-05-08T21:39:31Z
    date copyrightFebruary 2012
    date issued2012
    identifier other%28asce%29co%2E1943-7862%2E0000409.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58562
    description abstractDelay claims are a common occurrence in construction projects. Many techniques have been developed to assess these delays. The time impact technique is the preferred approach for resolving complex disputes that are related to delays and delay compensation. However, this approach is time-consuming and costly to operate. This research proposes a new approach, similar to the time impact technique, which evaluates delay events in chronological order. The details of the modified time impact analysis (MTIA) method are provided, along with one example to demonstrate its advantages. This method is significantly easier to prepare, and the results generated by this new approach are easier to discuss and examine.
    publisherAmerican Society of Civil Engineers
    titleModified Time Impact Analysis Method
    typeJournal Paper
    journal volume138
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000402
    treeJournal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian