description abstractDelay claims are a common occurrence in construction projects. Many techniques have been developed to assess these delays. The time impact technique is the preferred approach for resolving complex disputes that are related to delays and delay compensation. However, this approach is time-consuming and costly to operate. This research proposes a new approach, similar to the time impact technique, which evaluates delay events in chronological order. The details of the modified time impact analysis (MTIA) method are provided, along with one example to demonstrate its advantages. This method is significantly easier to prepare, and the results generated by this new approach are easier to discuss and examine.
publisherAmerican Society of Civil Engineers
titleModified Time Impact Analysis Method
typeJournal Paper
journal volume138
journal issue2
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0000402
treeJournal of Construction Engineering and Management:;2012:;Volume ( 138 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record