YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    New Approach to Developing Conceptual Cost Estimates for Highway Projects

    Source: Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 011
    Author:
    Mounir El Asmar
    ,
    Awad S. Hanna
    ,
    Gary C. Whited
    DOI: 10.1061/(ASCE)CO.1943-7862.0000355
    Publisher: American Society of Civil Engineers
    Abstract: Developing a reliable project cost estimate is a challenge for any state highway agency (SHA), especially at the conceptual stage. A conceptual estimate is defined in this paper as the estimate prepared at the point at which only 30% of the design is complete. This paper describes a statistical approach to producing a reliable conceptual cost estimate when few project design details have been finalized and many assumptions still form the basis of the estimate. This approach used an analysis similar to the program evaluation and review technique (PERT), which is more commonly used in project scheduling, to assign certainty factors to cost estimates. The approach uses a combination of historical bid data for major roadway items whose quantities can be estimated early in the development process and historical percentages for other major components of the project, called allowance and contingency factors. The paper focuses on (1) the methodology developed to analyze the historical bid data; (2) the analysis of 14 highway corridors with 77 projects whose as-bid construction costs were more than $830 million; and (3) a cross-validation of the approach used to validate the accuracy of the predictive model. By using a PERT-type technique, construction costs were accurately predicted at the conceptual stage within
    • Download: (542.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      New Approach to Developing Conceptual Cost Estimates for Highway Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58514
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMounir El Asmar
    contributor authorAwad S. Hanna
    contributor authorGary C. Whited
    date accessioned2017-05-08T21:39:25Z
    date available2017-05-08T21:39:25Z
    date copyrightNovember 2011
    date issued2011
    identifier other%28asce%29co%2E1943-7862%2E0000361.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58514
    description abstractDeveloping a reliable project cost estimate is a challenge for any state highway agency (SHA), especially at the conceptual stage. A conceptual estimate is defined in this paper as the estimate prepared at the point at which only 30% of the design is complete. This paper describes a statistical approach to producing a reliable conceptual cost estimate when few project design details have been finalized and many assumptions still form the basis of the estimate. This approach used an analysis similar to the program evaluation and review technique (PERT), which is more commonly used in project scheduling, to assign certainty factors to cost estimates. The approach uses a combination of historical bid data for major roadway items whose quantities can be estimated early in the development process and historical percentages for other major components of the project, called allowance and contingency factors. The paper focuses on (1) the methodology developed to analyze the historical bid data; (2) the analysis of 14 highway corridors with 77 projects whose as-bid construction costs were more than $830 million; and (3) a cross-validation of the approach used to validate the accuracy of the predictive model. By using a PERT-type technique, construction costs were accurately predicted at the conceptual stage within
    publisherAmerican Society of Civil Engineers
    titleNew Approach to Developing Conceptual Cost Estimates for Highway Projects
    typeJournal Paper
    journal volume137
    journal issue11
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000355
    treeJournal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 011
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian