| contributor author | Mounir El Asmar | |
| contributor author | Awad S. Hanna | |
| contributor author | Gary C. Whited | |
| date accessioned | 2017-05-08T21:39:25Z | |
| date available | 2017-05-08T21:39:25Z | |
| date copyright | November 2011 | |
| date issued | 2011 | |
| identifier other | %28asce%29co%2E1943-7862%2E0000361.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/58514 | |
| description abstract | Developing a reliable project cost estimate is a challenge for any state highway agency (SHA), especially at the conceptual stage. A conceptual estimate is defined in this paper as the estimate prepared at the point at which only 30% of the design is complete. This paper describes a statistical approach to producing a reliable conceptual cost estimate when few project design details have been finalized and many assumptions still form the basis of the estimate. This approach used an analysis similar to the program evaluation and review technique (PERT), which is more commonly used in project scheduling, to assign certainty factors to cost estimates. The approach uses a combination of historical bid data for major roadway items whose quantities can be estimated early in the development process and historical percentages for other major components of the project, called allowance and contingency factors. The paper focuses on (1) the methodology developed to analyze the historical bid data; (2) the analysis of 14 highway corridors with 77 projects whose as-bid construction costs were more than $830 million; and (3) a cross-validation of the approach used to validate the accuracy of the predictive model. By using a PERT-type technique, construction costs were accurately predicted at the conceptual stage within | |
| publisher | American Society of Civil Engineers | |
| title | New Approach to Developing Conceptual Cost Estimates for Highway Projects | |
| type | Journal Paper | |
| journal volume | 137 | |
| journal issue | 11 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/(ASCE)CO.1943-7862.0000355 | |
| tree | Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 011 | |
| contenttype | Fulltext | |