contributor author | Mehmet Emre Bayraktar | |
contributor author | Makarand Hastak | |
contributor author | Sanjiv Gokhale | |
contributor author | Bhavin Safi | |
date accessioned | 2017-05-08T21:39:24Z | |
date available | 2017-05-08T21:39:24Z | |
date copyright | September 2011 | |
date issued | 2011 | |
identifier other | %28asce%29co%2E1943-7862%2E0000351.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/58503 | |
description abstract | Projects must meet budget, schedule, safety, and quality goals to be regarded as a success. Many factors come into play, and many decisions are made that influence a project’s outcome. Today, owners are often faced with deciding between an execution strategy that emphasizes either project cost or project schedule. Such a decision may be made not once, but throughout the life of the project. Project teams, when required by the owner to make a cost-schedule trade-off, generate common sense ideas, best practices, and other means of achieving the desired trade-off through brainstorming sessions. This paper offers a tool for systematically identifying the techniques which are most effective in achieving the trade-off goal. Project teams can then use these techniques in a timely fashion to increase the likelihood of project success. | |
publisher | American Society of Civil Engineers | |
title | Decision Tool for Selecting the Optimal Techniques for Cost and Schedule Reduction in Capital Projects | |
type | Journal Paper | |
journal volume | 137 | |
journal issue | 9 | |
journal title | Journal of Construction Engineering and Management | |
identifier doi | 10.1061/(ASCE)CO.1943-7862.0000345 | |
tree | Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 009 | |
contenttype | Fulltext | |