Show simple item record

contributor authorMehmet Emre Bayraktar
contributor authorMakarand Hastak
contributor authorSanjiv Gokhale
contributor authorBhavin Safi
date accessioned2017-05-08T21:39:24Z
date available2017-05-08T21:39:24Z
date copyrightSeptember 2011
date issued2011
identifier other%28asce%29co%2E1943-7862%2E0000351.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58503
description abstractProjects must meet budget, schedule, safety, and quality goals to be regarded as a success. Many factors come into play, and many decisions are made that influence a project’s outcome. Today, owners are often faced with deciding between an execution strategy that emphasizes either project cost or project schedule. Such a decision may be made not once, but throughout the life of the project. Project teams, when required by the owner to make a cost-schedule trade-off, generate common sense ideas, best practices, and other means of achieving the desired trade-off through brainstorming sessions. This paper offers a tool for systematically identifying the techniques which are most effective in achieving the trade-off goal. Project teams can then use these techniques in a timely fashion to increase the likelihood of project success.
publisherAmerican Society of Civil Engineers
titleDecision Tool for Selecting the Optimal Techniques for Cost and Schedule Reduction in Capital Projects
typeJournal Paper
journal volume137
journal issue9
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0000345
treeJournal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 009
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record