YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Estimating Work Zone Road User Cost for Alternative Contracting Methods in Highway Construction Projects

    Source: Journal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 007
    Author:
    Yimin Zhu
    ,
    Irtishad Ahmad
    ,
    Li Wang
    DOI: 10.1061/(ASCE)CO.1943-7862.0000020
    Publisher: American Society of Civil Engineers
    Abstract: Highway construction often causes an additional road user cost (RUC) to motorists due to traffic flow interruption and congestion in work zones. Consequently, facility owners, such as the Florida Department of Transportation (FDOT), are often interested in using alternative contracting methods such as
    • Download: (118.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Estimating Work Zone Road User Cost for Alternative Contracting Methods in Highway Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/58178
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorYimin Zhu
    contributor authorIrtishad Ahmad
    contributor authorLi Wang
    date accessioned2017-05-08T21:38:54Z
    date available2017-05-08T21:38:54Z
    date copyrightJuly 2009
    date issued2009
    identifier other%28asce%29co%2E1943-7862%2E0000025.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58178
    description abstractHighway construction often causes an additional road user cost (RUC) to motorists due to traffic flow interruption and congestion in work zones. Consequently, facility owners, such as the Florida Department of Transportation (FDOT), are often interested in using alternative contracting methods such as
    publisherAmerican Society of Civil Engineers
    titleEstimating Work Zone Road User Cost for Alternative Contracting Methods in Highway Construction Projects
    typeJournal Paper
    journal volume135
    journal issue7
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000020
    treeJournal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 007
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian