Show simple item record

contributor authorYimin Zhu
contributor authorIrtishad Ahmad
contributor authorLi Wang
date accessioned2017-05-08T21:38:54Z
date available2017-05-08T21:38:54Z
date copyrightJuly 2009
date issued2009
identifier other%28asce%29co%2E1943-7862%2E0000025.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58178
description abstractHighway construction often causes an additional road user cost (RUC) to motorists due to traffic flow interruption and congestion in work zones. Consequently, facility owners, such as the Florida Department of Transportation (FDOT), are often interested in using alternative contracting methods such as
publisherAmerican Society of Civil Engineers
titleEstimating Work Zone Road User Cost for Alternative Contracting Methods in Highway Construction Projects
typeJournal Paper
journal volume135
journal issue7
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0000020
treeJournal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 007
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record