contributor author | Peter E. D. Love | |
contributor author | David J. Edwards | |
contributor author | Jim Smith | |
contributor author | Derek H. T. Walker | |
date accessioned | 2017-05-08T21:37:13Z | |
date available | 2017-05-08T21:37:13Z | |
date copyright | December 2009 | |
date issued | 2009 | |
identifier other | %28asce%29cf%2E1943-5509%2E0000057.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/57644 | |
description abstract | Rework has been identified as a major contributor to cost and schedule overrun in construction projects. Previous studies that have examined rework are based on a limited data sets and thus eschew generalizations being made about the key determinants. Using data from 260 completed building | |
publisher | American Society of Civil Engineers | |
title | Divergence or Congruence? A Path Model of Rework for Building and Civil Engineering Projects | |
type | Journal Paper | |
journal volume | 23 | |
journal issue | 6 | |
journal title | Journal of Performance of Constructed Facilities | |
identifier doi | 10.1061/(ASCE)CF.1943-5509.0000054 | |
tree | Journal of Performance of Constructed Facilities:;2009:;Volume ( 023 ):;issue: 006 | |
contenttype | Fulltext | |