Show simple item record

contributor authorPeter E. D. Love
contributor authorDavid J. Edwards
contributor authorJim Smith
contributor authorDerek H. T. Walker
date accessioned2017-05-08T21:37:13Z
date available2017-05-08T21:37:13Z
date copyrightDecember 2009
date issued2009
identifier other%28asce%29cf%2E1943-5509%2E0000057.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/57644
description abstractRework has been identified as a major contributor to cost and schedule overrun in construction projects. Previous studies that have examined rework are based on a limited data sets and thus eschew generalizations being made about the key determinants. Using data from 260 completed building
publisherAmerican Society of Civil Engineers
titleDivergence or Congruence? A Path Model of Rework for Building and Civil Engineering Projects
typeJournal Paper
journal volume23
journal issue6
journal titleJournal of Performance of Constructed Facilities
identifier doi10.1061/(ASCE)CF.1943-5509.0000054
treeJournal of Performance of Constructed Facilities:;2009:;Volume ( 023 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record