YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Profit Measures and Methods of Economic Analysis for Capital Project Selection

    Source: Journal of Management in Engineering:;1988:;Volume ( 004 ):;issue: 003
    Author:
    Tung Au
    DOI: 10.1061/(ASCE)9742-597X(1988)4:3(217)
    Publisher: American Society of Civil Engineers
    Abstract: The distinction between profit measures for capital investment and methods of economic analysis for project selection is discussed. Various methods of analysis for the selection of alternatives without budget constraints are examined. The selection of independent projects under budget constraints is also considered. The examination of the assumptions and issues related to the objective of profit maximization should clarify some misunderstandings often found in the literature of engineering economy.
    • Download: (745.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Profit Measures and Methods of Economic Analysis for Capital Project Selection

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/55689
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorTung Au
    date accessioned2017-05-08T21:32:52Z
    date available2017-05-08T21:32:52Z
    date copyrightJuly 1988
    date issued1988
    identifier other%28asce%299742-597x%281988%294%3A3%28217%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/55689
    description abstractThe distinction between profit measures for capital investment and methods of economic analysis for project selection is discussed. Various methods of analysis for the selection of alternatives without budget constraints are examined. The selection of independent projects under budget constraints is also considered. The examination of the assumptions and issues related to the objective of profit maximization should clarify some misunderstandings often found in the literature of engineering economy.
    publisherAmerican Society of Civil Engineers
    titleProfit Measures and Methods of Economic Analysis for Capital Project Selection
    typeJournal Paper
    journal volume4
    journal issue3
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)9742-597X(1988)4:3(217)
    treeJournal of Management in Engineering:;1988:;Volume ( 004 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian