description abstractThe distinction between profit measures for capital investment and methods of economic analysis for project selection is discussed. Various methods of analysis for the selection of alternatives without budget constraints are examined. The selection of independent projects under budget constraints is also considered. The examination of the assumptions and issues related to the objective of profit maximization should clarify some misunderstandings often found in the literature of engineering economy.
publisherAmerican Society of Civil Engineers
titleProfit Measures and Methods of Economic Analysis for Capital Project Selection
typeJournal Paper
journal volume4
journal issue3
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)9742-597X(1988)4:3(217)
treeJournal of Management in Engineering:;1988:;Volume ( 004 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record