YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Geotechnical and Geoenvironmental Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Geotechnical and Geoenvironmental Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Setup Following Installation of Dynamic Anchors in Normally Consolidated Clay

    Source: Journal of Geotechnical and Geoenvironmental Engineering:;2009:;Volume ( 135 ):;issue: 004
    Author:
    M. D. Richardson
    ,
    C. D. O’Loughlin
    ,
    M. F. Randolph
    ,
    C. Gaudin
    DOI: 10.1061/(ASCE)1090-0241(2009)135:4(487)
    Publisher: American Society of Civil Engineers
    Abstract: This paper describes a series of centrifuge model tests designed to assess the increase in capacity of dynamic anchors due to setup in normally consolidated clay. The tests involved measurement of the vertical capacity of 1:200 reduced scale model anchors following various periods of postinstallation consolidation. The short-term capacity was shown to be dependent on the anchor impact velocity. Cavity expansion solutions for consolidation around a solid driven pile were found to provide agreement with the experimental results. A simplified capacity calculation technique predicted higher friction ratio values than is typically observed for driven piles; however, these calculations were complicated by the unusual dynamic anchor load–displacement response and uncertainty regarding the true sample shear strength. Dynamic anchor consolidation proceeds at a slower rate than for suction caissons and open-ended piles of similar equivalent diameter. However, the results indicate that depending on the site conditions, dynamically installed anchors remain a viable alternative to conventional deep-water mooring techniques.
    • Download: (713.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Setup Following Installation of Dynamic Anchors in Normally Consolidated Clay

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/53489
    Collections
    • Journal of Geotechnical and Geoenvironmental Engineering

    Show full item record

    contributor authorM. D. Richardson
    contributor authorC. D. O’Loughlin
    contributor authorM. F. Randolph
    contributor authorC. Gaudin
    date accessioned2017-05-08T21:29:28Z
    date available2017-05-08T21:29:28Z
    date copyrightApril 2009
    date issued2009
    identifier other%28asce%291090-0241%282009%29135%3A4%28487%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/53489
    description abstractThis paper describes a series of centrifuge model tests designed to assess the increase in capacity of dynamic anchors due to setup in normally consolidated clay. The tests involved measurement of the vertical capacity of 1:200 reduced scale model anchors following various periods of postinstallation consolidation. The short-term capacity was shown to be dependent on the anchor impact velocity. Cavity expansion solutions for consolidation around a solid driven pile were found to provide agreement with the experimental results. A simplified capacity calculation technique predicted higher friction ratio values than is typically observed for driven piles; however, these calculations were complicated by the unusual dynamic anchor load–displacement response and uncertainty regarding the true sample shear strength. Dynamic anchor consolidation proceeds at a slower rate than for suction caissons and open-ended piles of similar equivalent diameter. However, the results indicate that depending on the site conditions, dynamically installed anchors remain a viable alternative to conventional deep-water mooring techniques.
    publisherAmerican Society of Civil Engineers
    titleSetup Following Installation of Dynamic Anchors in Normally Consolidated Clay
    typeJournal Paper
    journal volume135
    journal issue4
    journal titleJournal of Geotechnical and Geoenvironmental Engineering
    identifier doi10.1061/(ASCE)1090-0241(2009)135:4(487)
    treeJournal of Geotechnical and Geoenvironmental Engineering:;2009:;Volume ( 135 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian