YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Geotechnical and Geoenvironmental Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Geotechnical and Geoenvironmental Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Probabilistic Approach for Design and Hydrologic Performance Assessment of Reconstructed Watersheds

    Source: Journal of Geotechnical and Geoenvironmental Engineering:;2007:;Volume ( 133 ):;issue: 009
    Author:
    Amin Elshorbagy
    ,
    S. Lee Barbour
    DOI: 10.1061/(ASCE)1090-0241(2007)133:9(1110)
    Publisher: American Society of Civil Engineers
    Abstract: The oil sands mining industry in Canada has made a commitment to reclaim mining areas to an equivalent capability to that which existed prior to mining. An essential requirement in the design of reclamation covers to meet this objective is that all covers must have a sufficient available water holding capacity (AWHC) in order to supply sufficient moisture for vegetation over the summer moisture deficit typical in the region. AWHC is currently based on static evaluations of wilting point and field capacity under a constant annual evapotranspiration demand. This paper presents an alternative probabilistic approach by which the hydrologic performance of these reclamation soil covers can be assessed. A field-calibrated water balance model is used along with the available historical meteorological record to estimate the maximum soil moisture deficit that a soil cover is able to sustain over the growing season. Frequency curves of the maximum annual moisture deficit are used to assess the probability that a cover is able to provide any particular threshold of moisture demand. The method also allows for a quantification of the predictive uncertainty of the model. The predictive uncertainty is used as a margin of safety to estimate a design value of moisture deficit for various alternative cover designs. This paper recommends procedures for a frequency-based assessment and design of reclamation soil covers in the oil sands industry. This method takes into account climatic variability as well as parameter uncertainty in estimating the soil moisture deficit.
    • Download: (204.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Probabilistic Approach for Design and Hydrologic Performance Assessment of Reconstructed Watersheds

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/53205
    Collections
    • Journal of Geotechnical and Geoenvironmental Engineering

    Show full item record

    contributor authorAmin Elshorbagy
    contributor authorS. Lee Barbour
    date accessioned2017-05-08T21:29:01Z
    date available2017-05-08T21:29:01Z
    date copyrightSeptember 2007
    date issued2007
    identifier other%28asce%291090-0241%282007%29133%3A9%281110%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/53205
    description abstractThe oil sands mining industry in Canada has made a commitment to reclaim mining areas to an equivalent capability to that which existed prior to mining. An essential requirement in the design of reclamation covers to meet this objective is that all covers must have a sufficient available water holding capacity (AWHC) in order to supply sufficient moisture for vegetation over the summer moisture deficit typical in the region. AWHC is currently based on static evaluations of wilting point and field capacity under a constant annual evapotranspiration demand. This paper presents an alternative probabilistic approach by which the hydrologic performance of these reclamation soil covers can be assessed. A field-calibrated water balance model is used along with the available historical meteorological record to estimate the maximum soil moisture deficit that a soil cover is able to sustain over the growing season. Frequency curves of the maximum annual moisture deficit are used to assess the probability that a cover is able to provide any particular threshold of moisture demand. The method also allows for a quantification of the predictive uncertainty of the model. The predictive uncertainty is used as a margin of safety to estimate a design value of moisture deficit for various alternative cover designs. This paper recommends procedures for a frequency-based assessment and design of reclamation soil covers in the oil sands industry. This method takes into account climatic variability as well as parameter uncertainty in estimating the soil moisture deficit.
    publisherAmerican Society of Civil Engineers
    titleProbabilistic Approach for Design and Hydrologic Performance Assessment of Reconstructed Watersheds
    typeJournal Paper
    journal volume133
    journal issue9
    journal titleJournal of Geotechnical and Geoenvironmental Engineering
    identifier doi10.1061/(ASCE)1090-0241(2007)133:9(1110)
    treeJournal of Geotechnical and Geoenvironmental Engineering:;2007:;Volume ( 133 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian