| contributor author | H. Randolph Thomas | |
| contributor author | Ralph D. Ellis Jr. | |
| date accessioned | 2017-05-08T21:23:02Z | |
| date available | 2017-05-08T21:23:02Z | |
| date copyright | February 2009 | |
| date issued | 2009 | |
| identifier other | %28asce%291084-0680%282009%2914%3A1%2829%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/49312 | |
| description abstract | Contractors must often work in unfavorable weather. Two important questions arise. How much labor inefficiency will be incurred (which leads to the question of how much should the estimate be increased) and how can the negative impacts be mitigated? This paper addresses these two questions. The literature is reviewed and data from multiple projects are examined to estimate the average loss of efficiency resulting from very hot and very cold temperatures and from rain and snow. The average loss of efficiency estimates are used in a simple example to illustrate how to decide how much to increase the workhour estimate to account for adverse weather. Fundamental principles are stated so contractors can mitigate the effects of unfavorable weather conditions. It is postulated that if the principles are followed, labor inefficiencies resulting from weather-related disruptions are less likely to occur. | |
| publisher | American Society of Civil Engineers | |
| title | Fundamental Principles of Weather Mitigation | |
| type | Journal Paper | |
| journal volume | 14 | |
| journal issue | 1 | |
| journal title | Practice Periodical on Structural Design and Construction | |
| identifier doi | 10.1061/(ASCE)1084-0680(2009)14:1(29) | |
| tree | Practice Periodical on Structural Design and Construction:;2009:;Volume ( 014 ):;issue: 001 | |
| contenttype | Fulltext | |