Show simple item record

contributor authorH. Randolph Thomas
contributor authorRalph D. Ellis Jr.
date accessioned2017-05-08T21:23:02Z
date available2017-05-08T21:23:02Z
date copyrightFebruary 2009
date issued2009
identifier other%28asce%291084-0680%282009%2914%3A1%2829%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/49312
description abstractContractors must often work in unfavorable weather. Two important questions arise. How much labor inefficiency will be incurred (which leads to the question of how much should the estimate be increased) and how can the negative impacts be mitigated? This paper addresses these two questions. The literature is reviewed and data from multiple projects are examined to estimate the average loss of efficiency resulting from very hot and very cold temperatures and from rain and snow. The average loss of efficiency estimates are used in a simple example to illustrate how to decide how much to increase the workhour estimate to account for adverse weather. Fundamental principles are stated so contractors can mitigate the effects of unfavorable weather conditions. It is postulated that if the principles are followed, labor inefficiencies resulting from weather-related disruptions are less likely to occur.
publisherAmerican Society of Civil Engineers
titleFundamental Principles of Weather Mitigation
typeJournal Paper
journal volume14
journal issue1
journal titlePractice Periodical on Structural Design and Construction
identifier doi10.1061/(ASCE)1084-0680(2009)14:1(29)
treePractice Periodical on Structural Design and Construction:;2009:;Volume ( 014 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record