YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Systematic Risk Management Approach for Construction Projects

    Source: Journal of Construction Engineering and Management:;1990:;Volume ( 116 ):;issue: 003
    Author:
    Jamal F. Al‐Bahar
    ,
    Keith C. Crandall
    DOI: 10.1061/(ASCE)0733-9364(1990)116:3(533)
    Publisher: American Society of Civil Engineers
    Abstract: Risk is inherently present in all construction projects. Quite often, construction projects fail to achieve their time, quality, and budget goals. A risk model entitled construction risk management system (CRMS) is introduced to help contractors identify project risks and systematically to analyze and manage them. The CRMS model is a logical substitute for the traditional intuitive unsystematic approach currently used by most contractors. The influence diagramming technique and Monte Carlo simulation are used as tools to analyze and evaluate project risks. Alternative risk management strategies are suggested. Such strategies include: risk avoidance, risk transfer, risk retention, loss reduction, and risk prevention and insurance.
    • Download: (877.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Systematic Risk Management Approach for Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/49175
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorJamal F. Al‐Bahar
    contributor authorKeith C. Crandall
    date accessioned2017-05-08T21:22:48Z
    date available2017-05-08T21:22:48Z
    date copyrightSeptember 1990
    date issued1990
    identifier other%28asce%290733-9364%281990%29116%3A3%28533%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/49175
    description abstractRisk is inherently present in all construction projects. Quite often, construction projects fail to achieve their time, quality, and budget goals. A risk model entitled construction risk management system (CRMS) is introduced to help contractors identify project risks and systematically to analyze and manage them. The CRMS model is a logical substitute for the traditional intuitive unsystematic approach currently used by most contractors. The influence diagramming technique and Monte Carlo simulation are used as tools to analyze and evaluate project risks. Alternative risk management strategies are suggested. Such strategies include: risk avoidance, risk transfer, risk retention, loss reduction, and risk prevention and insurance.
    publisherAmerican Society of Civil Engineers
    titleSystematic Risk Management Approach for Construction Projects
    typeJournal Paper
    journal volume116
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1990)116:3(533)
    treeJournal of Construction Engineering and Management:;1990:;Volume ( 116 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian