YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Placement of AASHTO Type 6 Modified Bridge Girders

    Source: Practice Periodical on Structural Design and Construction:;2002:;Volume ( 007 ):;issue: 001
    Author:
    Scott A. David
    ,
    Cliff J. Schexnayder
    DOI: 10.1061/(ASCE)1084-0680(2002)7:1(9)
    Publisher: American Society of Civil Engineers
    Abstract: The Arizona Department of Transportation SR 101 Pima Freeway project included construction of the bridge discussed in this case study. This particular bridge is a mainline span over Tatum Boulevard. The aspects of construction discussed here encompass a description of AASHTO Type 6 Modified prestressed girders, the planning process for setting the 19 girders, and transport and placement of the girders. Thorough planning and control are required every time a crane lifts a load. In the case of a
    • Download: (181.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Placement of AASHTO Type 6 Modified Bridge Girders

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/49038
    Collections
    • Journal of Structural Design and Construction Practice

    Show full item record

    contributor authorScott A. David
    contributor authorCliff J. Schexnayder
    date accessioned2017-05-08T21:22:39Z
    date available2017-05-08T21:22:39Z
    date copyrightFebruary 2002
    date issued2002
    identifier other%28asce%291084-0680%282002%297%3A1%289%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/49038
    description abstractThe Arizona Department of Transportation SR 101 Pima Freeway project included construction of the bridge discussed in this case study. This particular bridge is a mainline span over Tatum Boulevard. The aspects of construction discussed here encompass a description of AASHTO Type 6 Modified prestressed girders, the planning process for setting the 19 girders, and transport and placement of the girders. Thorough planning and control are required every time a crane lifts a load. In the case of a
    publisherAmerican Society of Civil Engineers
    titlePlacement of AASHTO Type 6 Modified Bridge Girders
    typeJournal Paper
    journal volume7
    journal issue1
    journal titlePractice Periodical on Structural Design and Construction
    identifier doi10.1061/(ASCE)1084-0680(2002)7:1(9)
    treePractice Periodical on Structural Design and Construction:;2002:;Volume ( 007 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian