| contributor author | Scott A. David | |
| contributor author | Cliff J. Schexnayder | |
| date accessioned | 2017-05-08T21:22:39Z | |
| date available | 2017-05-08T21:22:39Z | |
| date copyright | February 2002 | |
| date issued | 2002 | |
| identifier other | %28asce%291084-0680%282002%297%3A1%289%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/49038 | |
| description abstract | The Arizona Department of Transportation SR 101 Pima Freeway project included construction of the bridge discussed in this case study. This particular bridge is a mainline span over Tatum Boulevard. The aspects of construction discussed here encompass a description of AASHTO Type 6 Modified prestressed girders, the planning process for setting the 19 girders, and transport and placement of the girders. Thorough planning and control are required every time a crane lifts a load. In the case of a | |
| publisher | American Society of Civil Engineers | |
| title | Placement of AASHTO Type 6 Modified Bridge Girders | |
| type | Journal Paper | |
| journal volume | 7 | |
| journal issue | 1 | |
| journal title | Practice Periodical on Structural Design and Construction | |
| identifier doi | 10.1061/(ASCE)1084-0680(2002)7:1(9) | |
| tree | Practice Periodical on Structural Design and Construction:;2002:;Volume ( 007 ):;issue: 001 | |
| contenttype | Fulltext | |