Show simple item record

contributor authorWolf, Hartwig
contributor authorWettstein, Arthur
contributor authorFaltermeier, Robert
contributor authorGraf, Peter
contributor authorSchupp, Daniel
date accessioned2024-12-24T18:52:38Z
date available2024-12-24T18:52:38Z
date copyright6/1/2024 12:00:00 AM
date issued2024
identifier issn0742-4795
identifier othergtp_146_07_071011.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4302909
description abstractThe Leibstadt nuclear power plant (KKL) in Switzerland was originally commissioned in 1984 with a nominal power output of 1000 MWel. Since then, there have been several uprates of the boiling water reactor (BWR), which have increased the power to 1275 MWel. After the nearly four decades of operation, the original condenser was impacted by advanced erosion corrosion and by progressive performance deterioration. In addition, the thermal power uprates required load reduction during hot summer periods to avoid high condenser back pressure. Consequently, KKL asked GE to carry out a comprehensive retrofit study to identify potential improvements on both lifetime and performance. These included robust material selection, optimized extraction of noncondensable gases by means of a bespoke air cooler section of the condenser and applying GE Steam Power's latest innovative tube pattern design, which is aligned to BWR requirements. However, site constraints prevented a typical modular condenser retrofit. Hence, working in a close cooperation between KKL and GE Steam Power, a customized retrofit concept was developed which used semi-prefabricated skeletal modules and an on-site rebuild of the condenser. In total, approximately 475 tons of old condenser material were dismantled, 24 new semi-prefabricated skeletal modules were installed, a condenser with 51,600 tubes was rebuilt on-site and 8 waterboxes were replaced with an improved design made of stainless steel. More than 350 professionals contributed to the successful retrofit with an overall site effort of 270,000 working hours—increasing the power output to 1285 MWel.
publisherThe American Society of Mechanical Engineers (ASME)
titleCondenser Retrofit in Leibstadt Nuclear Power Plant (Boiling Water Reactor): Far Beyond a Standard Modular Solution
typeJournal Paper
journal volume146
journal issue7
journal titleJournal of Engineering for Gas Turbines and Power
identifier doi10.1115/1.4063449
journal fristpage71011-1
journal lastpage71011-11
page11
treeJournal of Engineering for Gas Turbines and Power:;2024:;volume( 146 ):;issue: 007
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record