YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • ASME Open Journal of Engineering
    • View Item
    •   YE&T Library
    • ASME
    • ASME Open Journal of Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Offshore Logistics: Scenario Planning and Installation Modeling of Floating Offshore Wind Projects

    Source: ASME Open Journal of Engineering:;2023:;volume( 002 )::page 21013-1
    Author:
    Torres, Esperanza Susana
    ,
    Thies, Philipp R.
    ,
    Lawless, Mark
    DOI: 10.1115/1.4056882
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: The offshore installation, logistics, and commissioning activities are currently estimated to make up 20% to 30% of the capital expenditures (CAPEX) of offshore wind projects. Technical and geographical factors affect both the CAPEX during construction and the installation schedule, such as a lack of supporting port infrastructure, the availability of specialized vessels, the distance from the wind farm to shore, accessibility, water depths, and seabed conditions. In addition, there are significant risks during the construction phase, such as uncertain durations due to the sensitivity of marine operations to weather conditions. Identifying supply chain requirements is critical in the early stages of project planning in order to avoid time delays and cost overruns during the transport and installation process. This study explores and analyzes the logistic requirements and installation methods of a floating offshore wind (FOW) technology. Using an advanced forecasting and decision support tool, realistic case scenarios are simulated at a variety of potential sites for FOW deployment across the UK. Technical risks associated with installation strategies are identified and classified. The results provide a comparison of key installation performance indicators of each case scenario (e.g., installation rate per wind turbine, weather downtime). This study is of interest to researchers, offshore wind project developers, service providers, and other key stakeholders seeking to optimize planning and logistics to drive down CAPEX costs, reduce the construction downtime, and minimize risks during marine operations.
    • Download: (1.138Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Offshore Logistics: Scenario Planning and Installation Modeling of Floating Offshore Wind Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4291800
    Collections
    • ASME Open Journal of Engineering

    Show full item record

    contributor authorTorres, Esperanza Susana
    contributor authorThies, Philipp R.
    contributor authorLawless, Mark
    date accessioned2023-08-16T18:18:25Z
    date available2023-08-16T18:18:25Z
    date copyright3/3/2023 12:00:00 AM
    date issued2023
    identifier issn2770-3495
    identifier otheraoje_2_021013.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4291800
    description abstractThe offshore installation, logistics, and commissioning activities are currently estimated to make up 20% to 30% of the capital expenditures (CAPEX) of offshore wind projects. Technical and geographical factors affect both the CAPEX during construction and the installation schedule, such as a lack of supporting port infrastructure, the availability of specialized vessels, the distance from the wind farm to shore, accessibility, water depths, and seabed conditions. In addition, there are significant risks during the construction phase, such as uncertain durations due to the sensitivity of marine operations to weather conditions. Identifying supply chain requirements is critical in the early stages of project planning in order to avoid time delays and cost overruns during the transport and installation process. This study explores and analyzes the logistic requirements and installation methods of a floating offshore wind (FOW) technology. Using an advanced forecasting and decision support tool, realistic case scenarios are simulated at a variety of potential sites for FOW deployment across the UK. Technical risks associated with installation strategies are identified and classified. The results provide a comparison of key installation performance indicators of each case scenario (e.g., installation rate per wind turbine, weather downtime). This study is of interest to researchers, offshore wind project developers, service providers, and other key stakeholders seeking to optimize planning and logistics to drive down CAPEX costs, reduce the construction downtime, and minimize risks during marine operations.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleOffshore Logistics: Scenario Planning and Installation Modeling of Floating Offshore Wind Projects
    typeJournal Paper
    journal volume2
    journal titleASME Open Journal of Engineering
    identifier doi10.1115/1.4056882
    journal fristpage21013-1
    journal lastpage21013-12
    page12
    treeASME Open Journal of Engineering:;2023:;volume( 002 )
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian