Practical Experience From Risks of Decommissioning of Petrochemical FacilitiesSource: ASCEASME J Risk and Uncert in Engrg Sys Part B Mech Engrg:;2022:;volume( 008 ):;issue: 004::page 44701Author:Raman, R.;Medonos, S.
DOI: 10.1115/1.4055797Publisher: The American Society of Mechanical Engineers (ASME)
Abstract: Decommissioning is expensive and can be a complex operation involving a series of distinct phases, including cessation of operation, site preparation, decontamination, dismantling (demolition) and disposal. Each decommissioning phase has associated risks, which need to be identified, controlled, and minimized as far as reasonably practicable. A riskbased approach has been recognized, both for ensuring safety and reducing the total decommissioning period with cost savings. A traditional hazard and operability (HAZOP) study can be conveniently extended to decommissioning HAZOP, which is a guidewordbased collective multidisciplinary study identifying types of risks associated with decommissioning and allocates actions to the contractor and specialists departments for implementation. A decommissioning HAZOP enables to address the hazards and risks of decommissioning activities holistically, addresses all major contingencies, and results in safe decommissioning within budget. The presented decommissioning HAZOP study itself was completed ahead of time, without accidents. While there are other methods, decommissioning HAZOP and risk assessment was recognized as one of the effective methods for achieving the safety and project cost objectives.
|
Collections
Show full item record
| contributor author | Raman, R.;Medonos, S. | |
| date accessioned | 2023-04-06T13:00:10Z | |
| date available | 2023-04-06T13:00:10Z | |
| date copyright | 10/26/2022 12:00:00 AM | |
| date issued | 2022 | |
| identifier issn | 23329017 | |
| identifier other | risk_008_04_044701.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4288900 | |
| description abstract | Decommissioning is expensive and can be a complex operation involving a series of distinct phases, including cessation of operation, site preparation, decontamination, dismantling (demolition) and disposal. Each decommissioning phase has associated risks, which need to be identified, controlled, and minimized as far as reasonably practicable. A riskbased approach has been recognized, both for ensuring safety and reducing the total decommissioning period with cost savings. A traditional hazard and operability (HAZOP) study can be conveniently extended to decommissioning HAZOP, which is a guidewordbased collective multidisciplinary study identifying types of risks associated with decommissioning and allocates actions to the contractor and specialists departments for implementation. A decommissioning HAZOP enables to address the hazards and risks of decommissioning activities holistically, addresses all major contingencies, and results in safe decommissioning within budget. The presented decommissioning HAZOP study itself was completed ahead of time, without accidents. While there are other methods, decommissioning HAZOP and risk assessment was recognized as one of the effective methods for achieving the safety and project cost objectives. | |
| publisher | The American Society of Mechanical Engineers (ASME) | |
| title | Practical Experience From Risks of Decommissioning of Petrochemical Facilities | |
| type | Journal Paper | |
| journal volume | 8 | |
| journal issue | 4 | |
| journal title | ASCEASME J Risk and Uncert in Engrg Sys Part B Mech Engrg | |
| identifier doi | 10.1115/1.4055797 | |
| journal fristpage | 44701 | |
| journal lastpage | 447019 | |
| page | 9 | |
| tree | ASCEASME J Risk and Uncert in Engrg Sys Part B Mech Engrg:;2022:;volume( 008 ):;issue: 004 | |
| contenttype | Fulltext |