YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    SCaRC: Space-Constrained Resource-Constrained Scheduling System

    Source: Journal of Computing in Civil Engineering:;1997:;Volume ( 011 ):;issue: 001
    Author:
    Walid Y. Thabet
    ,
    Yvan J. Beliveau
    DOI: 10.1061/(ASCE)0887-3801(1997)11:1(48)
    Publisher: American Society of Civil Engineers
    Abstract: Current intelligent scheduling systems do not address the effect of limited work space on the generation of schedules. This paper describes SCaRC—Space-Constrained and Resource-Constrained knowledge-based system—for scheduling repetitive floors in multistory projects. The prototype system incorporates space-based scheduling techniques to recognize the space requirements of activities as a scheduling constraint. The space-based techniques are integrated with resource-based techniques for the production of schedules. The system also incorporates procedures to define and verify construction logic constraints associated with linear scheduling of vertical construction. An example illustrating the scheduling techniques implemented in SCaRC is presented.
    • Download: (1.333Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      SCaRC: Space-Constrained Resource-Constrained Scheduling System

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/42886
    Collections
    • Journal of Computing in Civil Engineering

    Show full item record

    contributor authorWalid Y. Thabet
    contributor authorYvan J. Beliveau
    date accessioned2017-05-08T21:12:38Z
    date available2017-05-08T21:12:38Z
    date copyrightJanuary 1997
    date issued1997
    identifier other%28asce%290887-3801%281997%2911%3A1%2848%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42886
    description abstractCurrent intelligent scheduling systems do not address the effect of limited work space on the generation of schedules. This paper describes SCaRC—Space-Constrained and Resource-Constrained knowledge-based system—for scheduling repetitive floors in multistory projects. The prototype system incorporates space-based scheduling techniques to recognize the space requirements of activities as a scheduling constraint. The space-based techniques are integrated with resource-based techniques for the production of schedules. The system also incorporates procedures to define and verify construction logic constraints associated with linear scheduling of vertical construction. An example illustrating the scheduling techniques implemented in SCaRC is presented.
    publisherAmerican Society of Civil Engineers
    titleSCaRC: Space-Constrained Resource-Constrained Scheduling System
    typeJournal Paper
    journal volume11
    journal issue1
    journal titleJournal of Computing in Civil Engineering
    identifier doi10.1061/(ASCE)0887-3801(1997)11:1(48)
    treeJournal of Computing in Civil Engineering:;1997:;Volume ( 011 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian