description abstractCurrent intelligent scheduling systems do not address the effect of limited work space on the generation of schedules. This paper describes SCaRC—Space-Constrained and Resource-Constrained knowledge-based system—for scheduling repetitive floors in multistory projects. The prototype system incorporates space-based scheduling techniques to recognize the space requirements of activities as a scheduling constraint. The space-based techniques are integrated with resource-based techniques for the production of schedules. The system also incorporates procedures to define and verify construction logic constraints associated with linear scheduling of vertical construction. An example illustrating the scheduling techniques implemented in SCaRC is presented.
publisherAmerican Society of Civil Engineers
titleSCaRC: Space-Constrained Resource-Constrained Scheduling System
typeJournal Paper
journal volume11
journal issue1
journal titleJournal of Computing in Civil Engineering
identifier doi10.1061/(ASCE)0887-3801(1997)11:1(48)
treeJournal of Computing in Civil Engineering:;1997:;Volume ( 011 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record