YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Nuclear Engineering and Radiation Science
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Nuclear Engineering and Radiation Science
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Necessity of Coordinating Nondestructive Examination Requirement for Nuclear Power Plant

    Source: Journal of Nuclear Engineering and Radiation Science:;2022:;volume( 009 ):;issue: 001::page 14701
    Author:
    Wu, Chongzhi;Sun, Haoming;Peng, Zhenguo;Wang, Benzheng
    DOI: 10.1115/1.4054169
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: This article covers the design management of nondestructive examination (NDE) requirements for nuclear power plants. In recent years, there are many problems related to NDE requirements during the construction of nuclear power plants in China. These problems usually occurred at different stages of the projects, or among the boundaries of different engineering disciplines, which are considered to be related to the incoordination of design management. Under some circumstances, NDE requirements may be repeated, missing or conflicted in different design documents, which leads to inconvenience, confusion and even misdirection to technicians, and increases the risk of omitted inspection and even leads to the occurrence of omitted inspection. Some of these problems have an adverse impact on the quality or progress of projects, and probably also pose potential risks to nuclear safety. In order to avoid these NDE problems that should not have occurred, the owners and designers of nuclear power plant need to pay close attention to promoting the coordination of NDE requirements. Suggestions are made from three aspects: (1) Coordinate the NDE requirements among different class structures, systems and components (SSCs). (2) Coordinate the NDE requirements at the phases of manufacturing, installation and preservice inspection. (3) Standardize the presentation mode of NDE requirements in design documents.
    • Download: (573.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Necessity of Coordinating Nondestructive Examination Requirement for Nuclear Power Plant

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4288377
    Collections
    • Journal of Nuclear Engineering and Radiation Science

    Show full item record

    contributor authorWu, Chongzhi;Sun, Haoming;Peng, Zhenguo;Wang, Benzheng
    date accessioned2022-12-27T23:19:24Z
    date available2022-12-27T23:19:24Z
    date copyright6/7/2022 12:00:00 AM
    date issued2022
    identifier issn2332-8983
    identifier otherners_009_01_014701.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4288377
    description abstractThis article covers the design management of nondestructive examination (NDE) requirements for nuclear power plants. In recent years, there are many problems related to NDE requirements during the construction of nuclear power plants in China. These problems usually occurred at different stages of the projects, or among the boundaries of different engineering disciplines, which are considered to be related to the incoordination of design management. Under some circumstances, NDE requirements may be repeated, missing or conflicted in different design documents, which leads to inconvenience, confusion and even misdirection to technicians, and increases the risk of omitted inspection and even leads to the occurrence of omitted inspection. Some of these problems have an adverse impact on the quality or progress of projects, and probably also pose potential risks to nuclear safety. In order to avoid these NDE problems that should not have occurred, the owners and designers of nuclear power plant need to pay close attention to promoting the coordination of NDE requirements. Suggestions are made from three aspects: (1) Coordinate the NDE requirements among different class structures, systems and components (SSCs). (2) Coordinate the NDE requirements at the phases of manufacturing, installation and preservice inspection. (3) Standardize the presentation mode of NDE requirements in design documents.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleNecessity of Coordinating Nondestructive Examination Requirement for Nuclear Power Plant
    typeJournal Paper
    journal volume9
    journal issue1
    journal titleJournal of Nuclear Engineering and Radiation Science
    identifier doi10.1115/1.4054169
    journal fristpage14701
    journal lastpage14701_6
    page6
    treeJournal of Nuclear Engineering and Radiation Science:;2022:;volume( 009 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian