YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Integration of Schedule, Cost, Traffic, and Risk into the Determination of Construction Contract Times

    Source: Journal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 006::page 04022061
    Author:
    Yangtian Yin
    ,
    Kunhee Choi
    ,
    H. David Jeong
    ,
    Ali Touran
    DOI: 10.1061/(ASCE)ME.1943-5479.0001089
    Publisher: ASCE
    Abstract: Balancing schedule, cost, mobility, and livability when planning urban highway projects built under accelerated contract provisions is a daunting task. Despite the wealth of research analyzing the effects of highway construction alternatives, holistic studies systemically integrating the scheduling, cost, and traffic risk-related aspects of accelerated highway projects to determine the most economical plans and contract times are rare. To fill this gap, this study developed a novel seven-step approach to choosing the most cost-effective construction alternatives and contract times through balanced tradeoffs that reduce disruption to the traveling public while minimizing construction time and road user cost. This study blends existing schedule and mobility impact assessment techniques with a risk analysis under accelerated construction conditions for the integration of schedule, cost, traffic, and risk into the determination of the most economical construction contract times. A best use case based on an actual project was also developed according to these seven steps, validating the practicality of the proposed systematic approach. This study will help state transportation agencies by providing a systematic integrative approach to decision-making, thus allowing for well-informed and optimally efficient choices among all available options.
    • Download: (3.459Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Integration of Schedule, Cost, Traffic, and Risk into the Determination of Construction Contract Times

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4287757
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorYangtian Yin
    contributor authorKunhee Choi
    contributor authorH. David Jeong
    contributor authorAli Touran
    date accessioned2022-12-27T20:39:57Z
    date available2022-12-27T20:39:57Z
    date issued2022/11/01
    identifier other(ASCE)ME.1943-5479.0001089.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4287757
    description abstractBalancing schedule, cost, mobility, and livability when planning urban highway projects built under accelerated contract provisions is a daunting task. Despite the wealth of research analyzing the effects of highway construction alternatives, holistic studies systemically integrating the scheduling, cost, and traffic risk-related aspects of accelerated highway projects to determine the most economical plans and contract times are rare. To fill this gap, this study developed a novel seven-step approach to choosing the most cost-effective construction alternatives and contract times through balanced tradeoffs that reduce disruption to the traveling public while minimizing construction time and road user cost. This study blends existing schedule and mobility impact assessment techniques with a risk analysis under accelerated construction conditions for the integration of schedule, cost, traffic, and risk into the determination of the most economical construction contract times. A best use case based on an actual project was also developed according to these seven steps, validating the practicality of the proposed systematic approach. This study will help state transportation agencies by providing a systematic integrative approach to decision-making, thus allowing for well-informed and optimally efficient choices among all available options.
    publisherASCE
    titleIntegration of Schedule, Cost, Traffic, and Risk into the Determination of Construction Contract Times
    typeJournal Article
    journal volume38
    journal issue6
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0001089
    journal fristpage04022061
    journal lastpage04022061_16
    page16
    treeJournal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian