YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Process Waste Analysis for Offsite Production Methods for House Construction: A Case Study of Factory Wall Panel Production

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 148 ):;issue: 001::page 05021011
    Author:
    Kudirat Ayinla
    ,
    Franco Cheung
    ,
    Martin Skitmore
    DOI: 10.1061/(ASCE)CO.1943-7862.0002219
    Publisher: ASCE
    Abstract: There is growing interest in the use of offsite manufacturing (OSM) in the construction industry despite criticism that some offsite approaches used by housebuilders do not offer real improvement compared with their onsite counterparts. Quantitative performance measures from previous studies are based on conventional onsite methods, with little attention paid to the performance and process improvements derived from various OSM methods. In response, a case study was conducted based on two OSM methods using standardized and nonstandardized processes for the production stage of a factory-manufactured wall panel. Value system analysis and root cause analysis using the 5Whys method was adopted to evaluate possible improvements in terms of process waste. The study reveals that OSM production methods that replicate site arrangements and activities involving significant manual tasks do not necessarily provide a marked improvement over the conventional onsite method. Thus, there is a need to reevaluate the processes involved to eliminate such embedded process wastes as non-value-added time and cost, and to consider automating critical activities. The analysis adopted in this case study provides measurable evidence of the performance gained from having a structured workflow over a nonstructured workflow. It also reveals how process wastes are generated in the production process of wall panels offsite.
    • Download: (1.507Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Process Waste Analysis for Offsite Production Methods for House Construction: A Case Study of Factory Wall Panel Production

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4283023
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorKudirat Ayinla
    contributor authorFranco Cheung
    contributor authorMartin Skitmore
    date accessioned2022-05-07T20:52:39Z
    date available2022-05-07T20:52:39Z
    date issued2021-10-23
    identifier other(ASCE)CO.1943-7862.0002219.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4283023
    description abstractThere is growing interest in the use of offsite manufacturing (OSM) in the construction industry despite criticism that some offsite approaches used by housebuilders do not offer real improvement compared with their onsite counterparts. Quantitative performance measures from previous studies are based on conventional onsite methods, with little attention paid to the performance and process improvements derived from various OSM methods. In response, a case study was conducted based on two OSM methods using standardized and nonstandardized processes for the production stage of a factory-manufactured wall panel. Value system analysis and root cause analysis using the 5Whys method was adopted to evaluate possible improvements in terms of process waste. The study reveals that OSM production methods that replicate site arrangements and activities involving significant manual tasks do not necessarily provide a marked improvement over the conventional onsite method. Thus, there is a need to reevaluate the processes involved to eliminate such embedded process wastes as non-value-added time and cost, and to consider automating critical activities. The analysis adopted in this case study provides measurable evidence of the performance gained from having a structured workflow over a nonstructured workflow. It also reveals how process wastes are generated in the production process of wall panels offsite.
    publisherASCE
    titleProcess Waste Analysis for Offsite Production Methods for House Construction: A Case Study of Factory Wall Panel Production
    typeJournal Paper
    journal volume148
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002219
    journal fristpage05021011
    journal lastpage05021011-14
    page14
    treeJournal of Construction Engineering and Management:;2021:;Volume ( 148 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian