Show simple item record

contributor authorKudirat Ayinla
contributor authorFranco Cheung
contributor authorMartin Skitmore
date accessioned2022-05-07T20:52:39Z
date available2022-05-07T20:52:39Z
date issued2021-10-23
identifier other(ASCE)CO.1943-7862.0002219.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4283023
description abstractThere is growing interest in the use of offsite manufacturing (OSM) in the construction industry despite criticism that some offsite approaches used by housebuilders do not offer real improvement compared with their onsite counterparts. Quantitative performance measures from previous studies are based on conventional onsite methods, with little attention paid to the performance and process improvements derived from various OSM methods. In response, a case study was conducted based on two OSM methods using standardized and nonstandardized processes for the production stage of a factory-manufactured wall panel. Value system analysis and root cause analysis using the 5Whys method was adopted to evaluate possible improvements in terms of process waste. The study reveals that OSM production methods that replicate site arrangements and activities involving significant manual tasks do not necessarily provide a marked improvement over the conventional onsite method. Thus, there is a need to reevaluate the processes involved to eliminate such embedded process wastes as non-value-added time and cost, and to consider automating critical activities. The analysis adopted in this case study provides measurable evidence of the performance gained from having a structured workflow over a nonstructured workflow. It also reveals how process wastes are generated in the production process of wall panels offsite.
publisherASCE
titleProcess Waste Analysis for Offsite Production Methods for House Construction: A Case Study of Factory Wall Panel Production
typeJournal Paper
journal volume148
journal issue1
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0002219
journal fristpage05021011
journal lastpage05021011-14
page14
treeJournal of Construction Engineering and Management:;2021:;Volume ( 148 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record