YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Managing Safety Hazards in Metro Subway Projects under Complex Environmental Conditions

    Source: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering:;2021:;Volume ( 008 ):;issue: 001::page 04021079
    Author:
    Xiaojuan Li
    ,
    Feiyu Liao
    ,
    Chen Wang
    ,
    Ali Alashwal
    DOI: 10.1061/AJRUA6.0001212
    Publisher: ASCE
    Abstract: During the expansion of metro subway projects, numerous safety hazards occur due to geotechnical site conditions, the complexity of the construction work, the concealment of the project, and the lengthy construction period. This study aims to identify the factors contributing to safety hazards and develop a risk evaluation system to determine the safety level in metro subway projects. A questionnaire survey administered to 224 participants working in different metro subway projects was used to collect the data. A second-order confirmatory model of hazard indexes was developed using structural equation modeling (SEM). A case study of an ongoing metro subway project was used to apply the developed risk evaluation system. Based on the developed model, the studied metro project scored 89.73, indicating the hazards level in this project is relatively controllable. The risk evaluation system developed in this study is useful to measure the safety level in metro construction projects to enable project managers and other stakeholders to determine the safety areas that need development and prevent potential hazards during the construction of this type of project.
    • Download: (1.540Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Managing Safety Hazards in Metro Subway Projects under Complex Environmental Conditions

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4282732
    Collections
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering

    Show full item record

    contributor authorXiaojuan Li
    contributor authorFeiyu Liao
    contributor authorChen Wang
    contributor authorAli Alashwal
    date accessioned2022-05-07T20:40:03Z
    date available2022-05-07T20:40:03Z
    date issued2021-11-29
    identifier otherAJRUA6.0001212.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4282732
    description abstractDuring the expansion of metro subway projects, numerous safety hazards occur due to geotechnical site conditions, the complexity of the construction work, the concealment of the project, and the lengthy construction period. This study aims to identify the factors contributing to safety hazards and develop a risk evaluation system to determine the safety level in metro subway projects. A questionnaire survey administered to 224 participants working in different metro subway projects was used to collect the data. A second-order confirmatory model of hazard indexes was developed using structural equation modeling (SEM). A case study of an ongoing metro subway project was used to apply the developed risk evaluation system. Based on the developed model, the studied metro project scored 89.73, indicating the hazards level in this project is relatively controllable. The risk evaluation system developed in this study is useful to measure the safety level in metro construction projects to enable project managers and other stakeholders to determine the safety areas that need development and prevent potential hazards during the construction of this type of project.
    publisherASCE
    titleManaging Safety Hazards in Metro Subway Projects under Complex Environmental Conditions
    typeJournal Paper
    journal volume8
    journal issue1
    journal titleASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    identifier doi10.1061/AJRUA6.0001212
    journal fristpage04021079
    journal lastpage04021079-15
    page15
    treeASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering:;2021:;Volume ( 008 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian