YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Composites for Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Composites for Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Design of Marine Dock Using Concrete Mixed with Seawater and FRP Bars

    Source: Journal of Composites for Construction:;2021:;Volume ( 025 ):;issue: 001::page 05020006-1
    Author:
    Vanessa Benzecry
    ,
    Marco Rossini
    ,
    Carlos Morales
    ,
    Steven Nolan
    ,
    Antonio Nanni
    DOI: 10.1061/(ASCE)CC.1943-5614.0001100
    Publisher: ASCE
    Abstract: This paper discusses the design of a marine dock in Miami, Florida reconstructed after sustaining damage from Hurricane Irma in 2017. This pioneering structure implements accelerated bridge construction methods using prefabricated bridge elements and systems. The structure is made of precast concrete members with basalt fiber-reinforced polymer and glass fiber-reinforced polymer bars, and concrete mixed with seawater. The structure is designed to withstand hurricane loading and the choice of materials is intended to leverage sustainability and resilience.
    • Download: (2.217Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Design of Marine Dock Using Concrete Mixed with Seawater and FRP Bars

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4270768
    Collections
    • Journal of Composites for Construction

    Show full item record

    contributor authorVanessa Benzecry
    contributor authorMarco Rossini
    contributor authorCarlos Morales
    contributor authorSteven Nolan
    contributor authorAntonio Nanni
    date accessioned2022-02-01T00:01:34Z
    date available2022-02-01T00:01:34Z
    date issued2/1/2021
    identifier other%28ASCE%29CC.1943-5614.0001100.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4270768
    description abstractThis paper discusses the design of a marine dock in Miami, Florida reconstructed after sustaining damage from Hurricane Irma in 2017. This pioneering structure implements accelerated bridge construction methods using prefabricated bridge elements and systems. The structure is made of precast concrete members with basalt fiber-reinforced polymer and glass fiber-reinforced polymer bars, and concrete mixed with seawater. The structure is designed to withstand hurricane loading and the choice of materials is intended to leverage sustainability and resilience.
    publisherASCE
    titleDesign of Marine Dock Using Concrete Mixed with Seawater and FRP Bars
    typeJournal Paper
    journal volume25
    journal issue1
    journal titleJournal of Composites for Construction
    identifier doi10.1061/(ASCE)CC.1943-5614.0001100
    journal fristpage05020006-1
    journal lastpage05020006-13
    page13
    treeJournal of Composites for Construction:;2021:;Volume ( 025 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian