Show simple item record

contributor authorVanessa Benzecry
contributor authorMarco Rossini
contributor authorCarlos Morales
contributor authorSteven Nolan
contributor authorAntonio Nanni
date accessioned2022-02-01T00:01:34Z
date available2022-02-01T00:01:34Z
date issued2/1/2021
identifier other%28ASCE%29CC.1943-5614.0001100.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4270768
description abstractThis paper discusses the design of a marine dock in Miami, Florida reconstructed after sustaining damage from Hurricane Irma in 2017. This pioneering structure implements accelerated bridge construction methods using prefabricated bridge elements and systems. The structure is made of precast concrete members with basalt fiber-reinforced polymer and glass fiber-reinforced polymer bars, and concrete mixed with seawater. The structure is designed to withstand hurricane loading and the choice of materials is intended to leverage sustainability and resilience.
publisherASCE
titleDesign of Marine Dock Using Concrete Mixed with Seawater and FRP Bars
typeJournal Paper
journal volume25
journal issue1
journal titleJournal of Composites for Construction
identifier doi10.1061/(ASCE)CC.1943-5614.0001100
journal fristpage05020006-1
journal lastpage05020006-13
page13
treeJournal of Composites for Construction:;2021:;Volume ( 025 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record