YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Grasping the Nonconformities in Building Construction Supply Chains

    Source: Journal of Performance of Constructed Facilities:;2021:;Volume ( 035 ):;issue: 001::page 04020141
    Author:
    Muhammad Saiful Islam
    ,
    Md Maksudul Islam
    ,
    Habibur R. T. Imran
    ,
    Martin Skitmore
    ,
    Madhav P. Nepal
    DOI: 10.1061/(ASCE)CF.1943-5509.0001546
    Publisher: ASCE
    Abstract: Identifying and understanding potential nonconformities in different construction phases is key to ensuring the anticipated quality and performance of a building in its service period. Previous studies mostly focus on studying nonconformities in the handover or posthandover phases of building projects. There has been relatively less attention paid to the issue in the preconstruction and construction phases of building projects, particularly in densely populated South Asian countries. This study aims to identify the potential and critical nonconformity problems from the initiation to construction phases of building projects, with a particular focus on Bangladesh, where the quality and integrity of building construction works and practices are generally lacking. The study is informed by a comprehensive literature review of the topic, followed by a series of discussions and workshops with highly qualified and experienced experts to identify the potential nonconformities frequently encountered in building construction projects. Additionally, three building projects are studied to identify the instances of nonconformities and their root causes. The major nonconformities identified from this study are improper soil investigation, poor quality of materials, poor quality of concrete, improper alignment of structural members, insufficient concrete cover, lack of or no curing of concrete, defective formwork, and early removal of formwork. Subsequently, specific remedial actions are recommended for the individuals/organizations involved throughout the building construction phases in developing countries, such as Bangladesh, toward improving the quality and performance of buildings in their service lives.
    • Download: (291.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Grasping the Nonconformities in Building Construction Supply Chains

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4269673
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorMuhammad Saiful Islam
    contributor authorMd Maksudul Islam
    contributor authorHabibur R. T. Imran
    contributor authorMartin Skitmore
    contributor authorMadhav P. Nepal
    date accessioned2022-01-30T22:49:05Z
    date available2022-01-30T22:49:05Z
    date issued2/1/2021
    identifier other(ASCE)CF.1943-5509.0001546.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4269673
    description abstractIdentifying and understanding potential nonconformities in different construction phases is key to ensuring the anticipated quality and performance of a building in its service period. Previous studies mostly focus on studying nonconformities in the handover or posthandover phases of building projects. There has been relatively less attention paid to the issue in the preconstruction and construction phases of building projects, particularly in densely populated South Asian countries. This study aims to identify the potential and critical nonconformity problems from the initiation to construction phases of building projects, with a particular focus on Bangladesh, where the quality and integrity of building construction works and practices are generally lacking. The study is informed by a comprehensive literature review of the topic, followed by a series of discussions and workshops with highly qualified and experienced experts to identify the potential nonconformities frequently encountered in building construction projects. Additionally, three building projects are studied to identify the instances of nonconformities and their root causes. The major nonconformities identified from this study are improper soil investigation, poor quality of materials, poor quality of concrete, improper alignment of structural members, insufficient concrete cover, lack of or no curing of concrete, defective formwork, and early removal of formwork. Subsequently, specific remedial actions are recommended for the individuals/organizations involved throughout the building construction phases in developing countries, such as Bangladesh, toward improving the quality and performance of buildings in their service lives.
    publisherASCE
    titleGrasping the Nonconformities in Building Construction Supply Chains
    typeJournal Paper
    journal volume35
    journal issue1
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)CF.1943-5509.0001546
    journal fristpage04020141
    journal lastpage04020141-15
    page15
    treeJournal of Performance of Constructed Facilities:;2021:;Volume ( 035 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian