Show simple item record

contributor authorMuhammad Saiful Islam
contributor authorMd Maksudul Islam
contributor authorHabibur R. T. Imran
contributor authorMartin Skitmore
contributor authorMadhav P. Nepal
date accessioned2022-01-30T22:49:05Z
date available2022-01-30T22:49:05Z
date issued2/1/2021
identifier other(ASCE)CF.1943-5509.0001546.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4269673
description abstractIdentifying and understanding potential nonconformities in different construction phases is key to ensuring the anticipated quality and performance of a building in its service period. Previous studies mostly focus on studying nonconformities in the handover or posthandover phases of building projects. There has been relatively less attention paid to the issue in the preconstruction and construction phases of building projects, particularly in densely populated South Asian countries. This study aims to identify the potential and critical nonconformity problems from the initiation to construction phases of building projects, with a particular focus on Bangladesh, where the quality and integrity of building construction works and practices are generally lacking. The study is informed by a comprehensive literature review of the topic, followed by a series of discussions and workshops with highly qualified and experienced experts to identify the potential nonconformities frequently encountered in building construction projects. Additionally, three building projects are studied to identify the instances of nonconformities and their root causes. The major nonconformities identified from this study are improper soil investigation, poor quality of materials, poor quality of concrete, improper alignment of structural members, insufficient concrete cover, lack of or no curing of concrete, defective formwork, and early removal of formwork. Subsequently, specific remedial actions are recommended for the individuals/organizations involved throughout the building construction phases in developing countries, such as Bangladesh, toward improving the quality and performance of buildings in their service lives.
publisherASCE
titleGrasping the Nonconformities in Building Construction Supply Chains
typeJournal Paper
journal volume35
journal issue1
journal titleJournal of Performance of Constructed Facilities
identifier doi10.1061/(ASCE)CF.1943-5509.0001546
journal fristpage04020141
journal lastpage04020141-15
page15
treeJournal of Performance of Constructed Facilities:;2021:;Volume ( 035 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record