YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Uncertainty and Legal Foreseeability in Flood Risk Management

    Source: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering:;2020:;Volume ( 006 ):;issue: 003
    Author:
    Neil S. Grigg
    DOI: 10.1061/AJRUA6.0001082
    Publisher: ASCE
    Abstract: The legal concept of foreseeability is an important element of proof in flood loss litigation against the US Army Corps of Engineers. Although hydrologic forecasting and engineering uncertainty address foreseeability, the civil engineering literature lacks discussion of how flood risk managers should consider the legal concept during the life cycle of projects. The 1928 Flood Control Act holds federal agencies immune from liability due to flood projects, so the litigation takes the alternate approach of takings per the Fifth Amendment of the US Constitution. Although foreseeability is a long-standing legal concept in determination of personal injury causation, flood risk scenarios involve many more players and complexities. If judges use concepts from simpler situations to judge complex flood cases, it might bias outcomes. A conceptual example synthesizes the main actions in five riverine flood cases against the Corps of Engineers that were alleged to be the proximate causes of flood damages. Foreseeability issues are discussed for hydrologic uncertainty, channel capacity, the condition of reservoirs and levees, changed project purposes, and land development. Based on these, current practices of the Corps of Engineers to address uncertainty and foreseeability in flood projects are reviewed.
    • Download: (431.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Uncertainty and Legal Foreseeability in Flood Risk Management

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4268002
    Collections
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering

    Show full item record

    contributor authorNeil S. Grigg
    date accessioned2022-01-30T21:19:21Z
    date available2022-01-30T21:19:21Z
    date issued9/1/2020 12:00:00 AM
    identifier otherAJRUA6.0001082.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4268002
    description abstractThe legal concept of foreseeability is an important element of proof in flood loss litigation against the US Army Corps of Engineers. Although hydrologic forecasting and engineering uncertainty address foreseeability, the civil engineering literature lacks discussion of how flood risk managers should consider the legal concept during the life cycle of projects. The 1928 Flood Control Act holds federal agencies immune from liability due to flood projects, so the litigation takes the alternate approach of takings per the Fifth Amendment of the US Constitution. Although foreseeability is a long-standing legal concept in determination of personal injury causation, flood risk scenarios involve many more players and complexities. If judges use concepts from simpler situations to judge complex flood cases, it might bias outcomes. A conceptual example synthesizes the main actions in five riverine flood cases against the Corps of Engineers that were alleged to be the proximate causes of flood damages. Foreseeability issues are discussed for hydrologic uncertainty, channel capacity, the condition of reservoirs and levees, changed project purposes, and land development. Based on these, current practices of the Corps of Engineers to address uncertainty and foreseeability in flood projects are reviewed.
    publisherASCE
    titleUncertainty and Legal Foreseeability in Flood Risk Management
    typeJournal Paper
    journal volume6
    journal issue3
    journal titleASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    identifier doi10.1061/AJRUA6.0001082
    page8
    treeASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering:;2020:;Volume ( 006 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian